The Form ties are used to connect opposite faces of wall formwork to restrain the applied concrete pressures. They transmit loads in tension between stiff vertical and/or horizontal members associated with the main formwork.
Steel Wailers serve as a form of horizontal bracing that resists the concrete pressure during concrete pouring and forming. All units are designed for quick and easy assembly. We have them available in various lengths; from 1.00m lengths up to 3.00m lengths depending on the panel width